Reference :
V-P-LK-E-00147
Date :
12/02/2005
Caption :
Batticaloa, Thiramadu camp. ICRC water and sanitation engineer talking with contractors about fuel lacking for bulldozers.
Confidentiality level :
public
Publication restrictions :
publication without restrictions
Description :
The ICRC engineer is directing trucks and buldozers, coordinating the construction of a camp at Thiramadu, a patch of land next to a railway line 700m from the sea. This will be a permanent camp, with each family receiving 250 square metres of land, initially for tents but possibly later for houses.
Original material :
digital
Resolution :
1536x2048
Orientation :
portrait
Colour/B&W :
colour