Reference :
V-P-PH-E-00886
Date :
30/11/2013
Caption :
Malabag Barangay. ICRC water engineers work closely with the local authorities to rehabilitate the water supply networks that were damaged by typhoon Haiyan in the municiapalities and barangays.
Confidentiality level :
public
Publication restrictions :
publication without restrictions
Description :
People of Malabag had to walk 1.5 km to collect water from the nearest water source before the installation of the ICRC water bladder. Handpumps in the community were damaged by typhoon Haiyan, contaminating the only water sources.
Damaged handpumps have left the water undrinkable due to high iron content, leaving the population vulnerable to water-borne diseases.
Original material :
digital
Resolution :
3870x2583
Orientation :
landscape
Colour/B&W :
colour